ARAW Series · Hybrid-Ready EstateIntensified Achiv Solar · Manila & Cebu
Estate class · Battery-ready

Solar for the whole house.

Two estate-class hybrid-ready packages for large homes running multiple air conditioners, home offices, and EV charging — 19.84 to 29.76 kWp on single-phase, battery wiring pre-installed from day one.

N° 02 — Estate Hybrid-Ready · 2026

Why solar now in May 2026.

Source · NGCP / ABS-CBN

Red Alert

Luzon grid hit Red Alert on 2026-05-13. Two-hour rotating brownouts on residential lines.

Source · ERC 2026

Three rate hikes

Residential utility rates rose three times in 2026 (Feb + March + May, ERC-confirmed). Payback math sharpens each cycle.

Source · Aboitiz Power, March 2026

22,000+ homes

Already on rooftop solar across the country. Crews + supplier inventory mature.

Two estate-class packages below — battery-pre-wired so the upgrade is a half-day plug-and-play.

How net-metering works

Daytime exports, evening credits.

Daytime solar generates more than your home uses. The surplus exports to your utility at 1:1 kWh credit — those credits offset evening grid pull, including air-conditioning. Without net-metering filed, savings drop to about half. Achiv supplies the PEE-signed plans; you file once and credits run monthly.

ARAW Hybrid-Ready

Estate

All-in

₱641,200

All-in · 14-day quote validity

  • Panels32 × N-type bifacial 620W panels (19.84 kWp · 25-yr panel performance)
  • Inverter16 kW single-phase hybrid inverter (5-yr warranty · 3 MPPT)
  • Battery on day 1None — LiFePO4 wiring pre-installed for future upgrade
  • Daily generation (Manila)~89 kWh (2,678 kWh/month avg)
  • Fits2–3 floor homes · ₱25,000–40,000 monthly bills · multiple aircons + home office
  • Bill savings · NMA active ★96–97% non-rainy season with active net-metering
  • Without NMA filedDrops to ~30–50% (daytime surplus uncompensated without net-metering filed)
  • With battery laterSame 96–97% savings + 2–5 hr brownout backup

★ Net-metering is the load-bearing lever for these savings — see “How net-metering works” above.

Future battery upgrade · half-day plug-and-play

Option A — 10.24 kWh (2× 5.12 kWh LiFePO4 modules)+₱104,4002–3.5 hr on essentials + AC
Option B — 16 kWh LiFePO4 battery+₱136,2602.5–5.5 hr on essentials + AC

Exact upgrade quoted at then-current supplier rate. Battery’s main value is brownout coverage, not extra bill savings — net-metering already monetizes daytime exports 1:1.

Requires 200A single-phase service entrance.

Largest single-inverter hybrid-ready system on single-phase. Maximum generation capacity now, battery when you're ready.

Flagship

ARAW Hybrid-Ready

Estate Plus

All-in

₱985,240

All-in · 14-day quote validity

  • Panels48 × N-type bifacial 620W panels (29.76 kWp · 25-yr panel performance)
  • Inverter2× 12 kW single-phase hybrid inverters in parallel (24 kW combined · 5-yr warranty each · 3 MPPT each)
  • Battery on day 1None — LiFePO4 wiring pre-installed on both inverters for future upgrade
  • Daily generation (Manila)~134 kWh (4,020 kWh/month avg)
  • Fits3+ floor homes · ₱35,000–50,000+ monthly bills · multiple ACs + home office + EV charging
  • Bill savings · NMA active ★96–97% non-rainy season with active net-metering
  • Without NMA filedDrops to ~30–50% (daytime surplus uncompensated without net-metering filed)
  • With battery laterSame 96–97% savings + 3–14 hr brownout backup depending on battery config

★ Net-metering is the load-bearing lever for these savings — see “How net-metering works” above.

Future battery upgrade · half-day plug-and-play

Option A-lite — 10.24 kWh (1× module per inverter)+₱108,000~2.7 hr on essentials + AC
Option A — 20.48 kWh (2× modules per inverter)+₱208,8003–9 hr depending on load
Option B-lite — 16 kWh LiFePO4 (one inverter)+₱136,260~5.1 hr on critical loads
Option B — 32 kWh LiFePO4 (both inverters)+₱272,5205–14 hr depending on load

Exact upgrade quoted at then-current supplier rate. Battery’s main value is brownout coverage, not extra bill savings — net-metering already monetizes daytime exports 1:1.

Requires 200A single-phase service entrance.

Two independent 12 kW inverters in parallel — 24 kW on single-phase without 3-phase meter upgrade. If one inverter needs servicing, the other keeps running.

Estate Plus · Parallel architecture

How two inverters work together.

Inverter A

Manages 24 panels + its own battery bank. Feeds the house through one half of the combined distribution panel.

Inverter B

Manages another 24 panels + its own battery bank. Feeds the house through the other half of the combined panel.

What every install includes.

Panel performance

25-yr performance · 12-yr product warranty

Inverter

5-yr warranty · cloud monitoring via app

Battery (when added)

8-yr warranty · IP65 enclosure

Rapid shutdown

NEC-compliant module-level rapid shutdown device (one per inverter for Estate Plus)

Workmanship

2–3 year Achiv warranty

Install crew

Same crew installs, warranties, and services your system

Permits

Building permit + ERC compliance handled end-to-end by Achiv

Documentation

As-built diagrams · panel string layout · breaker labels · warranty registrations · operating guide — delivered at handover

Year-1 Achiv Care

System health check, monitoring review, priority support. Auto-renews at ₱5,400/year unless cancelled

How payment works.

Reservation + price lockDefault

₱100,000 reservation on contract signing. Locks today’s component prices for your project — no re-quoting if supplier prices move. Applied to your materials total.

Materials balance

Remaining materials cost paid before your components ship from the supplier. Achiv coordinates the order — you see the landed cost with no markup.

Installation + commissioning

Professional fee, mobilization, and enclosure paid on commissioning day — after the system is tested, energized, and handover documentation is delivered.

14-day quote validity. Three payments, three milestones — reservation, delivery, handover.

50/50

Half at contract signing, half on completion and handover. Available on request — ask your project coordinator.

Frequently asked.

Why cheaper prices on social media?

Registered installer with DTI, BIR, Mayor’s Permit + non-VAT. Tier-1 hardware only — 25-yr panel performance, factory-traceable serials, signed warranty registrations. Cheap social-media quotes typically skip permits + use unbranded panels that fail year 2.

How long from contract to power-on?

Materials 1–7 working days after full materials payment is released. Install 5–7 working days for Estate-class systems. Net-metering activation: 2–6 weeks after we file your PEE-signed plans.

Who handles net-metering?

You file with your utility. We supply PEE-signed single-line + as-built drawings + Achiv-stamped plans. DOE accelerated approvals through 2026 — most homes clear NMA in weeks.

What is 200A single-phase service?

Estate-class systems need a 200A service entrance to handle the higher generation capacity. Most large homes already have it — we verify during site assessment and coordinate an upgrade with your utility if needed before install starts.

Can I add panels or battery later?

Battery wiring pre-installed — adding a battery later is a half-day plug-and-play. More panels depend on inverter headroom; we keep your as-built drawings on file for fast revisions.

Why two inverters instead of one bigger one?

Single-phase homes max out at 12 kW per inverter. Parallel configuration doubles capacity to 24 kW without upgrading to 3-phase. Each inverter operates independently — built-in redundancy if one ever needs servicing.

Full ARAW lineup.

PackageArrayFrom
Lite6.20 kWp₱226,966View
Home9.92 kWp₱335,794View
Max14.88 kWp₱488,211View
Estate19.84 kWp₱641,200This page
Estate Plus29.76 kWp₱985,240This page
Smaller system?

Under ₱25,000/month on your utility bill? The ARAW Hybrid-Ready trio (Lite, Home, Max) covers 6.20 to 14.88 kWp — same battery-ready architecture, sized for smaller loads.

View Hybrid-Ready trio

Book a site visit.

We measure shading, tilt, and your roof’s working area, then read your last three utility bills before quoting.

Mon–Sat · 8am–6pm

Prices current as of May 2026 under our 14-day quote validity; supplier pricing moves with FX. Savings assume active net-metering. Rainy season (~June–October) derates generation 25–35% so annual blended is typically ~85%. Site visit firms up the number against your roof and bill.