Source · NGCP / ABS-CBN
Red Alert
Luzon grid hit Red Alert on 2026-05-13. Two-hour rotating brownouts on residential lines.
Luzon hit Red Alert on May 13, 2026 with two-hour rotating brownouts. Utility residential rates rose three times this year. Three hybrid-ready packages — start with the system you need, add the battery when your bill, your brownout pattern, or your budget says it’s time.
Source · NGCP / ABS-CBN
Luzon grid hit Red Alert on 2026-05-13. Two-hour rotating brownouts on residential lines.
Source · ERC 2026
Residential utility rates rose three times in 2026 (Feb + March + May, ERC-confirmed). Payback math sharpens each cycle.
Source · Aboitiz Power, March 2026
Already on rooftop solar across the country. Crews + supplier inventory mature.
Three packages below — battery-pre-wired so the upgrade is a half-day plug-and-play.
How net-metering works
Daytime solar generates more than your home uses. The surplus exports to your utility at 1:1 kWh credit — those credits offset evening grid pull, including air-conditioning. Without net-metering filed, savings drop to about half. Achiv supplies the PEE-signed plans; you file once and credits run monthly.
ARAW Hybrid-Ready
All-in
₱226,966
All-in · 14-day quote validity
★ Net-metering is the load-bearing lever for these savings — see “How net-metering works” above.
Future upgrade · half-day plug-and-play
+₱56,250
5.12 kWh LiFePO4 battery · 4–6 hr backup on essential loads · exact upgrade quoted at then-current supplier rate. Battery's main value is brownout coverage, not extra bill savings — net-metering already monetizes daytime exports 1:1.
Daytime offset today, brownout protection tomorrow — no rewiring penalty.
ARAW Hybrid-Ready
All-in
₱335,794
All-in · 14-day quote validity
★ Net-metering is the load-bearing lever for these savings — see “How net-metering works” above.
Future upgrade · half-day plug-and-play
+₱104,400
10.24 kWh LiFePO4 stack · 6–10 hr backup on full house essentials · exact upgrade quoted at then-current supplier rate. Battery's main value is brownout coverage, not extra bill savings — net-metering already monetizes daytime exports 1:1.
Covers a medium home's full daytime load with an export cushion. Add storage when bills warrant.
ARAW Hybrid-Ready
All-in
₱488,211
All-in · 14-day quote validity
★ Net-metering is the load-bearing lever for these savings — see “How net-metering works” above.
Future upgrade · half-day plug-and-play
+₱136,260
16 kWh LiFePO4 battery · 8–14 hr backup on full house with 2 ACs · exact upgrade quoted at then-current supplier rate. Battery's main value is brownout coverage, not extra bill savings — net-metering already monetizes daytime exports 1:1.
Whole-home capacity with grid-export surplus on light-use days. Add full storage for true brownout independence.
Panel performance
25-yr performance · 12-yr product warranty
Inverter
5-yr warranty · cloud monitoring via app
Battery (when added)
8-yr warranty · IP65 enclosure
Workmanship
2–3 year Achiv warranty
Install crew
Same crew installs, warranties, and services your system
Permits
Building permit + ERC compliance handled end-to-end by Achiv
Documentation
As-built diagrams · panel string layout · breaker labels · warranty registrations · operating guide — delivered at handover
₱100,000 reservation on contract signing. Locks today’s component prices for your project — no re-quoting if supplier prices move. Applied to your materials total.
Remaining materials cost paid before your components ship from the supplier. Achiv coordinates the order — you see the landed cost with no markup.
Professional fee, mobilization, and enclosure paid on commissioning day — after the system is tested, energized, and handover documentation is delivered.
Half at contract signing, half on completion and handover. Available on request — ask your project coordinator.
Registered installer with DTI, BIR, Mayor’s Permit + non-VAT. Tier-1 hardware only — 25-yr panel performance, factory-traceable serials, signed warranty registrations. Cheap social-media quotes typically skip permits + use unbranded panels that fail year 2.
Materials 1–7 working days after reservation deposit. Install 3–4 working days for standard systems. Net-metering activation: 2–6 weeks after we file your PEE-signed plans.
You file with your utility. We supply PEE-signed single-line + as-built drawings + Achiv-stamped plans. DOE accelerated approvals through 2026 — most homes clear NMA in weeks.
Battery wiring pre-installed — adding a battery later is a half-day plug-and-play. More panels depend on inverter headroom; we keep your as-built drawings on file for fast revisions.
Over ₱25,000/month on your utility bill? The ARAW Estate series covers 19.84 to 29.76 kWp — same battery-ready architecture, sized for 2–3+ floor homes with multiple ACs and EV charging.
View Estate seriesUnder ₱8,000/month on your utility bill? Ask about ARAW Lite (₱142,806) — a smaller grid-tied entry tier sized for lower household loads.
View grid-tied lineupWe measure shading, tilt, and your roof’s working area, then read your last three utility bills before quoting.
Mon–Sat · 8am–6pm
Prices current as of May 2026 under our 14-day quote validity; supplier pricing moves with FX. Savings assume active net-metering. Rainy season (~June–October) derates generation 25–35% so annual blended is typically ~85%. Site visit firms up the number against your roof and bill.