Based in Manila & Cebu · installing nationwide
Every install, as we left it.
7 jobs, 34 photos, no stock. Roof arrays, inverter walls, battery cabinets and the wiring behind the door, each with the town and the month it was taken. Nothing staged; faces and addresses left out on purpose.
Newest first, Metro Manila first.
7 jobs · 34 photos
Hybrid6 photos
Metro Manila
July 2026
Hybrid9 photos
Mandaluyong
May 2026
Hybrid11 photos
Malolos
August 2026
Hybrid4 photos
Talisay
April 2026
Hybrid2 photos
Cebu City
April 2026
Hybrid1 photo
Cebu City
April 2026
Hybrid1 photo
Cebu City
March 2026
Hybrid · Metro Manila · July 2026
8 kW hybrid inverter, 5.12 kWh battery, 10 panels over a roof deck. Installed in one day.
Hybrid 13.2 kWp · Mandaluyong · May 2026
12 kW hybrid inverter, 32 kWh of battery, 20 panels. Inverter and batteries in a glass-fronted cabinet in the living room.
Hybrid 10 kWp · Malolos · August 2026
8 kW hybrid inverter, 16 kWh battery, 16 panels across three roof sections. Equipment on the rear wall by the kitchen.
Hybrid · Talisay · April 2026
Inverter, protection boxes and battery in a floor cabinet with a tinted window, fitted into a living room.
Hybrid · Cebu City · April 2026
Rooftop array, commissioned with every box open and every connection tested.
Hybrid · Cebu City · April 2026
Twin wall batteries under the inverter and two protection boxes on a utility wall.
Hybrid · Cebu City · March 2026
Large battery bank on a steel frame under the inverter and protection box.
Your roof next